Offsite Construction and its Effects on Construction Productivity

Home
breadCrumb image
Offsite Construction and its Effects on Construction Productivity

EG7020


Dissertation and Research Skills




Offsite Construction and its Effects on Construction Productivity





Dr Sohrab Donyavi




Student ID:

Student Name:

Abstract

The adoption of offset construction and management planning in industries improves performance of the project. Techniques, models, resources, and efficient systems for management of construction and system that is used in projects. Lean technology is widely used in projects for the improvement and development of more aspects of projects. This study aims to manage detailed information about functioning construction management systems. Approaches used in the report for understanding the factors and key points of project on the construction site. This report provides significant information about construction and project planning to improve structure of the plan with the help of the application and resources of project.

Offsite construction has become the most emerging plan and project at present time to make good quality of project in construction field. Offset construction is a domain that acknowledges the construction and management plans of industries. The integration of projects and technology that are used in projects is good for construction and management planning. Offset construction has a limited study and knowledge about systems and resources that are used in projects. Technology that is used in projects is a key factor for construction and defines the effects of construction management. OSC used many types of applications and methods to build perfect construction projects in industry.

Report provides an influence about the construction and management planning of project that has a good factor for OSC. The result of offset construction depends on the government and communities of country for funding and reliability of management of project. The diffusion performance of labour and employees can decrease the quality of project. Dual mediating and development of system function used many types of models and function in report. Technology innovations and the development of projects with the help of robotic systems increase reliability of projects.



List of Figures


Introduction

Offsite construction defines project management and parts of building framework. It designs construction on permanent location and particular site of construction. It involves planning, fabrication, designing, and transportation of hybrid systems of building material. Hybrid Offsite construction helps to build projects on time with fast progress. this type of hybrid construction is much better than on-site construction. OSC improves labour productivity and construction management system for construction. It is a technique that helps to development of site construction and management of buildings.

Off-site buildings construct industry is expending timely. The productivity of construction and managing systems will be covered in the report to understand construction. This construction project was managed according to the environmental conditions and building resources. Labour and employee management system handle to proper arrangement of function and construction management. The responsibility of development and planning of projects for better improvement and strategic planning will be covered in the report. it helps to manage and development to construction projects on time.

The construction management and development of building blocks for project and given scenario of organization. It depends on the structure of the management system and the empowerment of the project. It demonstrates the labour and employee management system of resources that can increase project productivity. Effects of construction management and development of the system. Management issues and effects make system lossless and with more effort, it makes the project reliable for client.

The offsite project management system or its uses in construction industry will be covered in the report for understanding of raw material, resources, employment, labour, plan, and system designing of the project. Most of the industries use offsite construction management systems for better development of the system and industry. The physical development of project and building blocks for understanding of requirement and development of the system. The construction and management of offset systems for industry is the best way to manage systems in the industry.

Background

Strategic planning and site management is the main part of project that helps to develop of project. It helps to increase labour productivity and essential resources for constructing a large amount of production and development of projects. Offsite construction productivity and empowerment of business development for diversified projects and their needs. Employee empowerment is offered articulate the models and functions of the system design for project. The line management system for the development of construction and diversified system helps to development of features and complete the needs of resources on the construction site.

It includes social structure and empowerment of system design and development authority to builders and development authority. the management of multidimensional approaches that helps to develop or improvement of building material and construction requirements. The production of resources and continued empowerment of the system and needs of project. The social structure empowerment of the construction with project in accessing the information of data and resources that can increase the productivity and sustainability of project.

Rational

This report is helpful for industries and organizations that work on offset construction management systems and also for students that study civil management. The management of offset construction and development of building in industrial areas for making efficient systems. Industries that work or study on offset construction management and development of strategies in project planning. The strategic planning and uses of resources for understanding site construction and management. Industry builders and project management teams of employees can use this report for understanding the issues and for solutions to problems on offset construction management systems.

Scope

The project on offset construction and management of business development in construction sites. It helps to increase the productivity and usability of projects for better improvement and development of function. Project management from offset construction planning and strategies will help to development of more operation procedures and increment of functions that are used in the construction and management of system. This project on offset construction and building management system helps to increment of business and strategic planning of building and construction system.

Aims and Objective

Aim: To improvement of offset construction for industries and problems of construction productivity.

Objective:

  • To identify the problems and issues on construction.

  • To improve in OSC and IBM to increase productivity and sustainability.

  • To determine the general losses and benefits of the OSC management system.

  • To analyze the production as per OSC management and recommendations and Planning.

  • To management of business structure and development of construction and productivity with strategic planning.

  • To determine direct capacitive balancing and Hybrid training system of construction management.

  • To utilization of resources and material identification on construction site.

Approach

Offset construction and management of buildings depends on designed approaches on planning that can increase the reliability of system. Quantitative and qualitative approaches used in reports for understanding the previous data and system need to be compared with the latest project management. OSC management system helps identify the issues and problems on the construction site for development of project. The methodology section of the dissertation system helps to cover the issues and problems of offset construction management system. Construction approach to building the system functions and solution for improvement of project and their uses. This system serves the issues and planning functions for improvement of the offset management and development system.

Dissertation Overview

Dissertation on offset construction and management overs the strategic planning and development of construction projects. Effects and productivity of the project will be covered in the report for better understanding of the construction management system. Problems on construction sites that can decrease the productivity of project will be covered in report to identify the solutions. Results on basis of construction and development of industrial systems define strategic planning. Sample and source of data collection approach for development of system and needs. Business strategic planning is defining the approaches that cover in dissertation report. Data collection and management of offset construction planning helps to develop of business. The theoretical approach of system and management function of offset construction and building of projects. The simplified network of offset construction and management system will be covered in report.

Project Plan

WBS: Offsite construction and management of project defined by work breakdown structure of the project. This structure defines the stages of project that should be followed as well. Construction of offsite project arranged as requirement of client. The project management and requirements of system follow as defined. Construction project management and processing of the system and its function should be more reliable and sustainable. WBS defines all parts and stages of project for better performance and designing. This structure can improve the project quality and decrease the cost of project. The system that is used in the WBS structure manages the function and requirements of client.

Shape1

Figure 1 WBS of Offsite Construction

(Source: Author 2022)


Gantt Chart: Understanding all set requirements and development of project according to the Gantt chart. This chart defines the needs and position of plans that are involved in system. It covers starting plan of project to the end of the requirement of project that fulfills the needs of the construction and management plan.

Figure 2 Gantt Chart

(Source: Author 2022)

Literature Review

Introduction of Offsite construction

According to Liu et.al. Offsite Construction (OSC) convey many products that are corelate to the building and construction. It has been in construction field for many years. The construction of pavilion roof construction is being invented in 1772. An offsite is a hybrid construction that is linked as a procedure which in take the planning strategy as along with planning strategy it also involves the fabrication as to be fabricated transportation of the item as to be assemble the required material with high and great speed so that the work needs to be finish as per schedule plan.

According to Darlow et. al. the offsite construction has many branches that is being used to relate the new construction carried by the construction company. It has many branches all around the world. With the use of latest and new technology it is being a very developed and it has many stakeholders working directly or indirectly to being take the organization to success. The most recent technological changes can be Information of modelling the business along with to build a very strong data communication that facilitates the manufactured automation types of process can be linked to the automation. As like many the types of industry provides the automation for to know the technical concept for the replacement of human labour as to being focus on to provide the best result and to increase the production. The construction approach that moves to be work as to access the work by remotely access form. There are various types of objectives are defined. Some of the objective for to upgrade the business are as follows:

  • To know the current states from automation of OSC.

  • To determine the various types of factors that constraints the automation to be uptake.

  • To know the problems that is being arise in the internal team as focusable tries to resolve the automation of OSC.

Effects

According to Brusselaers et. al 2020, the construction logistics are used to provide the various types of solution for the effects of logistics solution. As the scenario is concerned it helps in improving the logistic performance for the short along with long term planning that includes company goals and the scope together with definition. The industry for the construction is the paradox. The yearly growth rate for the construction is 3% for the sector of the crises. It involves the unfilled the remaining job.

The attributed for board construction for the construction is the reluctant for the modernize as well as the boosting techniques related to the productivity. The organization delivers its first car as a product in the 1919. The site becomes hardly changed as per the given time. The offsite construction is to be difficult for the penetration beings the global to the quality. The product is best suitable for the single family. This is the segment in history which is best suitable. In the market like the Sudan almost 80% of the new construction of the built suite. As the upward trends there is no major penetration is increased by 20%. There are various types of problems that is being faced. They are:

  • An Image Problem: - As in the continental Europe, actors associated with the low-quality along with the uniform with communist housing style. The offsite has evoked the memories to be cheap to solve the shortage of housing as a postwar. As compare to the US, there are many people that uses the income homes for the mobiles. One notable public of the expectation for this particular tendency is Japan, in that the offsite construction has to be considered for the premium for the high-quality products (Dou et.al. 2019).

  • Inflexibility for the Uniform Design: - Since the Past, to keep the cost maintain there are various types of standardized set by the organization for to provide the best adhere. The type of cutter with the cookies approach being trend with the conflicts from building constraints. As it also leads to be individual owner preference for little part of customized.

  • Local Building codes with the regulation: - It is being subjected to be traditionally being construct for the rules and regulations for the labour. The rules as are being made to be onsite, with some instances for the number of workers. IT usually being designed as to be making the rules as to be focused on to the trained workers are being hired for being work for the construction. There are various rules with the safety of the employees being working for the organization. It also requires the health safety along with planning codes with reference to provide the training workers as to being take part for to the workers family being insured (Dou et.al. 2019).

  • Aversion Risk: - The construction is being for the averse for the risk for getting the good condition off the products. It is being expensive when the step is not taken correct. As the construction has been based on the high-profile cases being used in to solve the cyclical business, as the cost pressure as well as low margins. The contractors are being used to unaccustomed with the investing more than millions of dollars for the factories. As the builders. It uses the new technology to make the product strongest. There are many types of technology being taken into consideration while developing a product. It also uses the different types of the new methods for the technologies. There are various types of the contractors that is being using the new methods as per the technology. As the technology is advanced it helps the construction filed to manufacture the product fast.

Idea of Sustainability in Off-site Construction

According to the AS Kumar et.al. it uses the construction as well as demolition, the work should be used globally being arising in the construction as well as renovating. The collaboration of techniques that are being used in the plaster for the demolition of the waste product being started in the 2010. The problems as along with construction is to while any product it harms the weather. Since 2010 the harm for the construction has been now focusing on saving environment. The various problems along with issues are as follows: -

  • Reduce: - The 3R is very important in construction that helps the business to be using the waste material for the products with high quality. While the product is created it is being important to identify the reuse or to recycle the things which is being left or disposed. This organization is very much focus on using the waste material for the making of transportation cost for the landfill. It uses the CO2 emission for the use of the demolition waste generated with the maintenance of strict size together with quality. It helps to reduce the cost of construction that will help the economic development along with cost-effective for the management practice for the construction work.

  • Reuse: - This step is being considered to be the most effective way of construction. It also uses the demolition waste of the products that are being used for mitigation for using to give them different functions with addition of their original use. The functions include reusability of aggregates along with bricks with the help of woods as so many other materials. The new products that are very essential that are the use of energy with the use of nature will helps to save the environment. The company uses the potential operation for to save the demolition of the waste that needs to develop the roads by using the waste materials. With the use of garbage, it leads to making of the bridges along with urban landscape. By recovering the waste material, it leads to reduce cost being generated for transportation.

  • Recycle: - It is the demolition waste that can be done by using the onsite as well as offsite that is being used in saving the huge amount of CO2. It leads to save the demand for the new raw material. This can save the land fill utilization. It is being used reducing the carbon emission produced during offsite construction. It helps the offsite construction to be focused on to use the new products very less. They can use the old products are used in developing the old products. The offside construction is using the mixture of the virgin material that are being used in recycling the developed item. It is very important to dispose as well as to reuse the product. The methods that are using the old and the new products by using the existing raw materials.

  • Disposal: - It will be use only when defined 3R is not compatible for the production then the disposal technique is used.as the type of waste being generated in the disposed in a landfill. In such type of cases the type of disposal being used to monitoring to eliminate the possible pollution. As being used the construction waste are being created in to use the recycled material or the reuse of the onsite construction. It uses the composite of the waste material that are used cement as the concreate.

Productivity

As per the Wang et.al. talks about as the vital component of any building the project. Being productive means that the project is being delayed as well as budget that becomes the overwhelmed to be contacted. As it is the ratio of the input along with output volumes. It tries to measure how the efficiency such as labour breaks as to be the capital. The product that is being used to produce as the economy to be the level of the output. It always tries to increase the enabled the U.S. business as a sector with more than nine times with more goods and services. It always focuses on the work productivity. It also tries to re-write goods and to produce the output with the same or the different amount of work. The productivity can be accomplished by the following component. They are:

Ability to plan: - On the face of it will be referring to give the unrealistic target as well as goals. Being able to avoid this to be able to make sure that to plan every day in a very great strategy. So, that it leads to help to achieve the small target for the construction. With keeping the same spirit, it leads to achieving the long-term goals. It also leads to guess to achieve the highest priority of task to be completed with the same or the different aspect of work. It is very necessary to complete the desirable task on time rest all the task can wait. It is working on this strategy.

Remain Focus: - It is very necessary to remain focus on the work that is being assigned or allotted. To complete the project of the task in the given time. The project should be focuses on to remain start or the process is to be started as per to plan a well-defined strategy is being set by the right back by the list planning that is being noted.

Consistency: - To remain consistent is really important. It always helps in providing the consistent role by which the consistent player plays a vital role. It always helps to grow the company as the way to be progressed. It will be move by the slow and fast move. As long as not to be stopped. It will be ascertained by using to be constant in doing the work with no blockage of the work. The contractor needs to be focused on the work for getting the consistent for the work that is being assign to them. It always helps the contractor to stay focused and complete the work in the given deadline.

Theoretical Framework

It is a framework that is being used to define the clarification of the theory. It is the structure which is being used to hold the supportive theory for the research study. It includes the concepts with the definition as well as focus on to the exiting theory that are being used in the construction study. This is the framework that is being resented in the early part of the dissertation. It will be depended on the rationale research for conducting the solution for the particular problems. The theoretical approach also focuses on to provide the research investigation for the particular problem. It tries to take a sense of structure that guides the research.

In the thesis of the dissertation, this framework will try to evaluate the theory for the most relevant research. The main goals for this research are as follows it also focuses on to provide the theories as well as models for the key concept. To explore the encyclopaedia entries can be a better place for the theories. It is the framework that is used to represent the conceptual framework. On the other hand, it has been observed that embodies used to specified the direction with the researcher which can be undertaken.

The theories can be multiple for as long the complexity that is going to be considered. The theories can be used at different levels other theory can be used. As it will be focused on the work for being deliver the work it can be used with maximum limit of two or three.

The key concept of the research is to propose the relation with having a proper relation between them. The discussion for the relevant theories which is being based on the literature work. It is the very strong framework that is being used in to check the direction of the theories. It is being used to focus on allowing to coordinate with the direction of the research for the theories that is based on the literature. It also provides the four dimensions for the research of the qualitative research.

It provides the new construction approach that is being used by moving the construction for the development of the offsite construction. The most reviewed research is being based on the manual review of being used for the gap in reproducibility. The holistic approach which is being assigned by the multiple methods which can be adopted.

By study of the approach, it is being based on the various objective: -

  • To study the bibliometric search that is used to select the academic publication.

  • To present a study to identify the gaps along with used to analysis the decade.

  • To overcome the backlash in the process and to fill the gaps as it leads to analysis for the areas.

The holistic approach for to provide the framework for the OSC to leads to increase in the future with the proper direction, it leads to encourage about the research that are inter related for the related research topics. It is being used to describe the holistic approach that is being linked with the inter disciplinary concept. It tries to explore the concept of the analysis for to find the gaps and to remove the gaps with using the new trends that is being linked for to provide the trends of the analysis. This study is being linked to provide the holistic approach for to provide the holistic review.

Figure 3: Co-occurrence of keywords

(Source: Wang 2022).

This can be found in the above figure that industrialized building system founds the most mention research project. It basically used to show the main research areas that is being linked to provide the solution of the risk. It also involves the risk to be managed in a proper way.

Simplified network of construction operation

Project Initiation and Management

The initial stage in which the planning and the outlining of the project is included, is required to be conducted in the network of construction. It gives a clarity of the steps to be followed in the project of off-site construction or even conventional construction. The use of this principle is supposed to be done, by the use of the work. In this process, whole of the project life cycle is made and then also reviewed.

Designing

The designing phase is the most important part in construction, because it will give all the details over the completion of the project. The design is the major step in the project, that will create an operation in the generation of a suitable design in the process. The design would act as a reference to get the material and to get the open study of the work. It will include the outline for the formation of complete evaluation.

Figure 4 Design of Offsite Construction

(Source: Smith 2018)

Off-Site Fabrication

The offsite project of construction requires the fabrication process to take place with the work of the sensible work, such that it will keep the work on the track. The fabrication is a network’s most important part, because that produces the final product of construction. It will compensate the time that the actual on-time project may take. It helps in the solution to be acquired the process by the hold of the fabrication and manufacturing based on the design made.

Transport

The transportation is one of the most important parts in any kind of construction process, the continuation to the network. The completion for the evaluative consistence that helps in extracting the conveyance of the goods. The fabricated material is then taken on-site, to be assembled and the product to be made and finalized. This makes an open study to the worker that it may open an estimation to the work that may open the work to an estimate comprehension.

Integration Process

Optimal Process Integration strategy

The completion of any kind of project could be attained only by the successful deployment of it on the working place or system. It is the same with the concept of offsite construction, where the continuation is to be attained in the system by the use of all the proportionate concepts of the continuity in the process. It will not only optimize the continuation of the practice, but also the change in it. The integration of Offsite manufacturing by the help of some integration of the continuity to the comparative study of the work and the final integration.

The use of all these essential establishments such as the design and the transport is supposed to be done in the process of integration, helping in the formation of a complete integration. The requirement is to be met equally and the deliverables are to be maintained in same amount, but the general estimation could be evaluated in the process (Sutrisna and Goulding 2019). The help of a certain study to be performed in the procedural escalation. It will provide an open study to the continuation of the evaluation for the managing of the project that is to be created offsite and to be assembled onsite and created.

This requirement is to be fulfilled by the use of the continuity to be gathered by the basic promotion to the management of work. It will create an evaluated study of the work, such that they convolute the estimations and stand still on them. It will manage to create a standard estimation such that it will create an elaborative study of the process. It is an open estimation to the work to be provided by an estimation in the field. The integration is then brought down in the process of evaluation of the field and the generative study of work all together.

Creating Ready-to-use Designs

The designing in the process could be considered to be the most important part in construction, because it will give all the details over the completion of the project. The design is the major step in the project, that will create an operation in the generation of a suitable design in the process. The design would act as a reference to get the material and to get the open study of the work. It will include the outline for the formation of complete evaluation. This makes the importance to be harnessed in the integration. This makes the completion to be evaluated in the process, based on the offsite work.

The design I supposed to be made like a LEGO, such that it can be attached to each other and the relevant joint, by the use of all the prospects such that they may open study to the work. It will manage to continue the work and create a complete structure at the same spot it is desired to be at. The completion of the work is also to be brought in to light by the help of the complete estimation to the work (Ortega Silva 2020). This is the evident way to integrate the offsite construction with the conventional methods and the completion of the work.

Material Focus

The material is to be made efficient enough in the process such that it will keep the consistent work to be stood still with the design, by the use of continuous implementation. It is essential to have an idea of what the use of the design would be, how is it to be implemented and where to implement it. The use of these attributes is added in the process, to understand what the material is to stand for. It creates an outline to the study for the completion of the work and the validation of the certain estimation such that they open a system of estimation to the work.

It creates a certainty over the project to be curated in such a way that the completion is attained in the system such that it ay opens an explanation to the work such that it will open the study. The completion of the work is attained in the validation of the implementation of the material and its physical properties. The properties such that it will make the compensated estimation to the work such that it will create the wonder in the process. It will make an open study to the process, helping the full study of the process.

Transportation

Transportation is evaluative in the system by the help of the need that is to be established in the system by the help of a general escalation in the process. It will create an openness to the study and the conveyance of the material becomes easy. It will convolute the time bound procedure to be taking place, helping the offsite construction to compete and adhere with the existing part of it. This may also include the system establishment in the user consideration. It is an evaluative estimation to be evaluated within the process and the valuation of certain collabouration.

Picture 3

Figure 5 Transportation through Flat Pack delivery

(Source: Smith 2018)

Issues in Integration

The issue in the integration of the work is to be extracted is the variation of the work and the estimation of the wrong magnitude may occur. This is the reason for the completion of the task, such that it will create an operative study of the work. It is essential in the making of the user and the generative study of the work to evaluate the certainty of the estimate study. It is the vulnerability that can break the value to the validated form (Agapiou 2021). It will not only show the issue in the implementation, but also the genesis of the issues such as the transport to fail to carry a whole project.

This is the establishment that will generate the evaluative structure to the complete estimation of the work to be collaborated in the system and generate the study with the use of the composite evaluation. It is required to hold the position in the field, by the use of some certainty to be provided in the system by the help of the continuous estimation. It is also the reason for the problem and the vulnerability to occur in the function and the changes may be required on the spot, changing the course of the project.

Offsite Construction as a Contemporary Practice

The complete estimation of the work is to be taken into action by the scape of all the evaluative estimations to bring in the process. There are various types of campaign that is being used to be considered as the time for that is being constructed in to managed the things in a proper way. There is various type of research methods that is being used in the construction business. here input is the raw material which is being used in to having the construction as a development. The processing involves the way of thinking of being taking actions. The third steps are the output it will be focused on to produce the better result for the output of construction.

Figure 6 Market of Offsite Construction by material

(Source: Allied Market Research 2020)

The concept of offsite construction is not very much popular in the exiting market of construction, such that it will generate the estimation to the work. It makes an open establishment to the structure that is desired to be constructed, by the composition of the work and the comprehension of the values, that may open the field to research. The compensation of the value proportion such that they may open the generative body to the compensation of the work. It will complement the issues that may occur and also benefit the market (Sutrisna et al. 2018). The comprehension of these concepts could be of estimation that provide an open study, such that it may create an open study to the compensated consideration of the budget. It will present the considerate change in the arrangement of the market. It will present the evaluated study over where exactly is the most possibility of problem and where is the least.

The current market could be eradicated in the system by the help of some estimate changes to be brought into the system. It will make the consideration more elabourate and open to the user certainty. The market promotes some budget friendly approaches towards offsite construction projects, such that it does not affect any outcome. The use of continuous estimation could be estimate in the system to outline the scope in a well-oriented direction.

Figure 7 Range of Offsite Construction

(Source: Smith 2018)

Analysis of Offsite construction

According to Nguyen et.al. 2021. It talks about the offsite construction deals with the building of the components. It has many different locations that is being used in to build permanently. It is a novel method which is being used by the OSC products that is being launched in the 21st century. This industry is being spread in the world wide for the model of the building the better information together with the building the concept that is being used for the advance building construction as the robotics as a technology.

The Australian is being focus in getting the information by verifying various surveys are being taken for the safety as well as the building construction to increase the optimum utilization relate to the sector. There is multiple momentum which are being used in the recent construction for the performance of the sector. The prices at the housing will be used for instance of the evaluated as well as being continue to being severely being unaffordable for the world. It also tries to play which are used to inspired the value for the build offsite for the UK to be taken to Australia.

As the concept of Prefabrication as its application are being verified by the construction practice. The stakeholders are being encourage to know about the techniques. As there are various types of automation that are being considered by the technological as a base factor that are being used in to provide the automation as to process development (Wang et al. 2020).

Shape2

Figure 8 Adoption of the OFC

(Source: Wang 2021)

It also focuses on to stakeholders’ engagement as to be focused for obtain the higher productivity. There is various type of research that is being conducted like qualitative and quantitative. As to the offsite construction it has been working on the hybrid approach that means it can use the qualitative for being used to give the quality by using the perfect solution or the structure material which is being used is to provide the quality. As the quantitative approach is concerned the number of being developed the product as to get the success in which no repair being given to develop the construction.

There are various types of campaign that is being used to be considered as the time for that is being constructed in to managed the things in a proper way. There is various type of research methods that is being used in the construction business. here input is the raw material which is being used in to having the construction as a development. The processing involves the way of thinking of being taking actions. The third steps are the output it will be focused on to produce the better result for the output of construction (Wang et al. 2020).

Methodology

Introduction

Outside construction as a specific approach on delivering the projects of building outside the construction site which is also called as offsite manufacturing transported site into a permanent location. Some specific modern methods are used for construction and have evolved to provide productivity and benefits over the major fundamental process. There are some criteria that are to be achieved in the following search it has a specific procedure of three different steps starting with searching and selecting from our collection of off-site construction management projects and papers which has some operational level providing the complete overview of project.

The next step is to map the selected papers into three different dimensions of acknowledging the project management and the complete phases in which the project lies so that each of the off-site construction projects and its types can be manufactured based upon the specific free assembly and service family models for different manufacturing phases. Some analysing trends are also considered as the next step for off-site Constructions where the complete evolution of knowledge is subjective towards the research trends and other frequencies of dimensions with the analysis of construction site and Project Management Research trends.

Considering all the studies and taking into account of analysis performed the complete dimensions are measured and the overall research is conducted for offsite Constructions. Complete research revolves around the knowledge gained from reviewing various off-site construction papers. The management of studying all these documents and implementing the research data in a particular tool is the overall approach that is followed with the result in favour of providing productive off-site construction results. There are some selected case studies that have a particular sector to perform within and evaluate the benefit off-site construction is varying from its level of maturity and analyzing the challenges created according to the performance and other evidence related to project construction and its establishment.

Study Design

The complete study is based on a specific design for generating the evidence-based research papers and other construction material available according to its delivered service for off-site construction determining the outcomes based on special addresses directed towards the economic factors, environmental factors, and other social impacts. The process of qualifying the complete research is based upon a specification related to the project benefit successfully implementing the complete hypothetical structured construction method based upon some traditional activities. The normalization is done according to the characterization of the project based upon its outcomes and other essential activities keeping an adequate characterization towards all the assessment activities undertaken (Razkenari et al. 2020).

The report further describes the overall evaluation of the direct finances, as well as all other correlations, are sustainability and life, and impacts are considered to be speculated towards the uncertainty validation of the complete outcomes that the project possesses. Understanding the major focus towards the essential parts of identifying the key process related to the off-site construction is based on some specific quantities and qualities that need to be realistically obtained and consistently improved to a specific report an essential part of the complete process for sustainability avoiding the distinctions and measuring the complete project over different influences subjective towards the exercise of construction and other priorities.

Specific challenges that are based upon the nature of the construction project considering the organization with multiple challenges to achieve a specific objective for particular research describing the challenges encountered and their consistent process to improve and potentially impact the overall research for mitigating the challenges (Zhou et al. 2019).

  1. Variability in measuring different methods has a specific back for performance area based upon the identification of quality and other issues which are slated to cost category in the construction and other proximity is which are considered towards assessing the valuable information.

  2. There are some challenges based upon the data collection where the variety of data collected over a specific lean towards the variable is incredibly uncertain for the quality, integrity, and accuracy for analysing the data which is being received.

  3. The industry has a specific requirement leading towards the responsibilities in a specific team for delivering a particular construction project on and off-site location with avoiding the factor of repetends.

  4. The complete accessibility and granularity of the data are based upon different steps of evaluation performed according to the interest and the contractor is responsible for the design and the cost estimates with the proper evaluation of maintenance and operational activities that are occurred in the construction process.

  5. There are some Outsourcing projects that impact the complete disaggregation according to the circumstances of multiple changes that are significant in the construction method providing the outcome to mitigate the results and consider the overall deviation for reasons and some results that are expected according to the project analysis.

The project also gets influenced by different activities and the offside construction has a specific circumstance to avoid and reflect that by multiple activities mitigating details and other descriptors have a project outcome which is requested along with the details of the construction activities. There are some constraints related to the off-site construction facing difficulties in quantifying the sustainability of the project and has some specific characteristics that are noted on the influences to made related to the construction process and method (Kamali and Hewage 2017).

Sample and Source of data

The complete source of data is based upon the paper collection and selection and the specific literature review which is essential to follow and critically present another search over a selected paper with the complete dedication and transparency of its processes. The search of offsite construction papers from different databases needs to be comprehensive towards the quality of the construction site and the researchers commonly go through the literature determining the complete knowledge of the construction other information which is a development towards the management of the construction site (Altaf et al. 2018).

There are some specific industrialized and construction activities that are prefabricated based upon the industrialization, option, modern methods of construction, modular projects and project fabrications based upon the construction methodology helps in determining the complete response of the screening process. Collecting the material that is the research papers from Scopus and web of science databases has a huge number of results related to the project selection and the construction process which is needed to be performed. There are different abstracts that help to determine the actual keywords and data and link the relevance within the construction activity performing multiple analyses and implementation towards the detailed analysis.

There is a specific knowledge which is depicted by the paper selection which helps in identifying the complete project off-site construction and its effective management which is towards the fluent body language and knowledge of other detailed structure considering the three dimensions classifying the area of Management, project phases, and off-site construction types (Jang et al., 2020). The management area is specific towards the studies classified the complete project management body of knowledge the development of a special institute for project management that helps in communicating over the construction project with an effective safety measurement. Management is the key aspect of complete classification towards the essential activities accommodated within the research papers providing some specific amount of information.

Discussing the project phases over the involvement of offsite construction with the manufactures building and other important activities related to the installations of different activities, transportation services, field Construction, phases of the project that are traditionally followed with the proper implementation. The project phases have multiple categories focusing on an individual aspect of the project design. The project phases are divided as the phase of planning, designing phase, manufacturing activities, the transportation requirement, assembly, and another maintenance phase that follows a particular response against the specific requirement (Architectural Engineering and Design Management 2018).

Discussing the types of off-site Constructions the classification varies upon the considered activities such as component manufacturing, sub-assembly units where the elements are constructed in factories presented offsite, there is a complete classification of non-volumetric assembly units which has a space availability usable elements, the volumetric create family unit helps in creating a usual space that can be further installed as an independent structure affecting the overall assembly towards the modular design and effectively using the space which is configured according to the responses of the actual structure and the building fabric.

Instrumentation

In the following report, the instrumentation considered to be followed according to the responses that are achieved after analysing the project management activities of off-site construction research that has a specific dimension.

The instrument used in achieving this methodology for the particular project has been used for considering various activities for management and effective project implementation. The project comprises various information consensual with the situation and the factor that can impact the overall performance of the project internally and externally. Some specific story building is based upon the building information modelling that is used for providing better quality indications, pre-manufacturing value determinations, and other influences that impact the story and its attributes according to the construction method involved (Arashpour et al. 2018). There is a specific characterization of the various activities with regards to the construction method but important to achieve the quality.

The complete descriptors of the projects which are connected to categorize the off-site construction paper consisting of specific project type, its work progress, location, description of location based on urban or rural area considering the responsibilities of project descriptions, a form of procurement according to the framework and the design of the building at different stages, form of contract upon the building designed and facilities. There are some activities that are based upon the pre-manufactured value which is calculated by the contribution of cost and the off-site material for the construction according to which qualitative estimates.

Instruments that are used to influence the project outcomes based upon the specific reference and experience of the project team finding out the opportunities to release benefits for a specific organization (Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system (Emerald Insight 2019). There are some projects which are based upon the portfolios on a larger part of the series the client has a specific incorporated construction activity that is mandatory to support over a specific project and requirements.

The complete targets for different elements are outspoken and incorporated with the offsite elements that help in extending the suitability of the project over different levels of complexity. There are some different characteristics and constraints by which the complete quantification of the project is affected is based upon the different numerical values considering a specific judgment necessary towards the generalized activities and other projects that are related to the specific methodology and has a categorized in part direct projects depending upon the proper evaluation with the specific tools and proper observation that is focused with the complete category.

The overall research results trends related to the project management in all the different faces have a specific area to grow and schedule the management properties over its implications and novelty towards the manufacturing implementation and the materials which are required to develop the factory environment for effective monitoring of quality and assembly products. There are some specific studies that are implemented in understanding the risk and other problems that need proper knowledge about each and every criterion focusing with the insufficient comparison of multiple ranges towards the project directory and the maintenance (Construction Management and Economics, 2020).

There is specific literature that results into the consideration of affecting the studies and determine where it influences multiple factors over some prominent construction concerned generals leading towards better project management for economics and Engineering Management perspective. There are different factors that are affecting productivity and have to be analysed in a specific manner that does not influence the overall descriptions of the construction site and does not consider a specific model related to the responses analysed from the literature of different authors. There is a link between the complete input and output process affecting multiple factors based upon material, equipment, labour, management activities, and other government instances that regulate over some of the Other external or internal influence that is affected throughout the construction site surroundings.

Data Collection Strategy

Data collection in any specific research is facilitated by a study that complies with different clarifications and discussions that implicitly provides a better option towards multiple roles in the off-site construction process and manufacturing services that are characterized according to the client's solution and package (Hosseini et al. 2018). The complete study of different processes needs proper evidence to the information which is appropriately focusing on influencing the design and some structural and construction activities that is relatively reflecting the importance of different case studies and research.

There are some archival influences that affect the study and research the complete focus towards the qualitative response of the analytical approach which is suitable in dealing with multiple problems that are affecting the interaction between the activities that are related to a practical process implementing the theoretical aspects with the typical process analysis and tracing the services and activities.

There are some specific theory-oriented processes related to the implementation of the approach which is describing multiple cases the technique of analytical explanation considering the theoretical and depend above a specific component of Framework independent with multiple variables proposed to interning the path of the quality and the case study that is affected by the implementation process-tracing of quality and quantity within the project consideration (Environmental sustainability of off-site manufacturing: a literature review (Emerald Insight 2019). There are some specific provisions based upon collecting the case studies and reviewing for further analysis describing a specific hybrid construction process leading towards the construction industry and law which is being educated over a specific methodology.

Other implementation that can provide guidance why relevant structure stipulations and other author's perspective of accepting a specific methodology and requirement of product understanding and delivery within the strict rules and regulations resulting in a proper build of performances. There are some specific provisions towards the analysis of the theoretical approach resulting in the acceptance as a requirement of the written contract with the withdrawal of a specific offer multiple commercial and other provisions towards the essential contract terms.

The approach also implicit the complete performance towards different communication laws and uniform commercial code that follows a specific hybrid communication according to the pro dominant frequency leaning with the specific factors of decisions followed by a common to incorporate various transactions related to the construction with the proper rule and regulation (Jin et al. 2018). The strategy that can be successfully implemented is not limited to the project phase, law, terms and conditions, designing, project management, planning activities, and other studies that are considering the complete scheduling of off-site construction projects.

The complete integration is based upon the reason behind the construction activity and effective management of integration, quality, scheduling, and other risk analysis related to the research, and the approach of a specific strategy within this scheduling and the project formation. There are some trade interfaces that are controlled by a different aspect of the project-specific towards the project completion after allocating some specific attributes to the downstream of the process and for the classification of systems and specific project requirements towards a related study within the complete improvement of productivity and labour (Proquest.com 2018).

Data Analysis

The data is collected for a specific purpose and analysis towards a specific approach focusing on the quality and required project management activities with the construction responsibility and arguments that are architected according to the building components and other subcontractor details based upon the prefabrication of trading within the offsite construction process. There is some specific questionnaire that resulted in understanding the approach and some specific assumptions towards the humidity of data related to the variance and normality according to the data collected through nonparametric methods the data collection based upon the research and interpretation.

The qualitative analysis is focused on the alternatives according to the narration and some telling features are also developed and emerged within the process of understanding the complete Incorporation with the technique and focusing towards multiple components of the framework characterizing each of the group by explaining the analysis towards the knowledge and clarification over some different aspect and responses within the system and approach of complete phases of design (Assaad et al. 2020).

The stakeholders, risk managers exhibit a specific area in the complete analysis report according to the off-site construction project and its management moving with the modular type of industry and other buildings that are facilitated according to the residence and industrial area. There are some investigations that are cited across the dimensions of offsite construction the multiple faces of planning and implementation of data consideration and assembly phases in a positive manner leading with the quality verification and approach of specific components.

The data collected is analytically explained according to the relevance of knowledge towards the occurrence in the construction site and project management according to the client's requirements, social rules and regulations, and project management activities that leave with specifications of understanding the complexity within the project approach. Requirements are specified and significant according to the duration of the project and have a specific potential to meet the complexity within the interface of design and manufacturing requirements for a specific duration supported by the supply chains and other components and off-site work construction.

Aspect is also based upon regulation and Standards that have specific strategies of choice to implement and estimate the methodology and approach related towards the environmental and social impacts with the technical development of approach and implementation (Vuuren and Middleton, 2020). Comparatively analysing the complete case study methodology that determined a predominance test for understanding the purpose of hybrid of side Constructions and other productivity increasing activities within the laws and special governance of some higher authorities.

Strategic leaders cutting edge of the criteria performing multiple test and data description related to the specific approach has descriptive information towards the research direction. The existing knowledge with the suggestions of different directions and other review paper that are prior over different terms of classification and responses derived from the study. An approach of developing and strategy in early phases the proper management of manufacturing process within the factories. It is the work of describing, planning and decision supports that benefited towards the stakeholder activities and positive response towards the cost performance and management of the project.

Research Approaches

Construction work depends on quality materials and the good productivity of raw materials. Quality is more important for construction work. A qualitative approach defines management and uses of quality materials in construction projects. Generally, for testing of material and checking of quality is based on research and testing laboratories of organization but qualitative approach defines the basic requirement of system. Used material and components in construction work are good in quality but ensure material strength and sustainability (Goh and Goh 2019). Offsite construction and management system of project needs to maintain quality of raw material that are used in project. Previous data about offset construction and management function that are already used in project, compare present scenario of project. Project management and operation of projects of construction should more reliable and sustainable for coming lots of years. The management of suitable functions and qualitative approaches can increase strength of project. Analysis of project for improvement should be reliable and effective for importance of project. The qualitative testing of materials attempting by quality manager of construction project. It will be more difficult to secure the project management planning for new technology in construction projects. Critical thinking an analysis of requirements that are used in projects can increase the quality of construction projects (Goh and Goh 2019).

Quantitative Analysis

Material and requirement of equipment in offsite construction management system defined by the quantitative approach of project. Without quantitative research, it can’t possible to analyse requirement systems and materials for project. Quantitative research can decrease the cost of project, it will be good for the project as financially. Some of the comments that are used in report can improve the quality and quantity of offsite construction management projects. Offsite construction managers hired highly experienced drivers that can handle transportation and logistics problems in construction. A quantitative approach can explore more options for the construction and management system of project. OSC is an exploratory method to build good and best quality construction projects (Murtagh et al. 2020). Many types of barriers in construction projects can decrease process of project but approaches that are used in report can decrease problems and increase process of project. The original extension of the construction project explores more views with the help of qualitative and quantitative approaches of report. To mitigate the problems and issues of project, use an offsite management plan for decreasing issues on the construction site. Transportation and limitation of using project equipment should more reliable and effective (Goh and Goh 2019).



Findings

Offsite construction should involve rules and regulations for improvement in policies for establishment of facilitating the adoption of OSC. The critical role of labour unions and employers can find more evolution of construction and management projects. Probably demonstrate the values and aspects of project plan. More findings on construction plans can improve the ability and sustainability of offset plans. Findings of construction plans and the effect of management should follow properly for better improvement and performance.

Figure 9 Onsite and Offsite construction

(Source: Matthias 2018)

Barriers to OSC adoption

Many types of barriers envelope in offset construction projects that can decrease the performance of projects. The critical overview of project plan and positive feedback helps to development of project management and the development of system and management structure. It also involves the4 environment, market value, policies, and regulations of the organization for implementation of knowledge of employees (Dou et al. 2019).

Higher initial cost: Offset construction and management project are best for industries but it has higher value for initial implementations of project. The total cost of project depends on small value of project can increase the cost of plan.

Low Standardization: It has low value of system and standard of material that is used in project. The complicated management and limitation of market demand, are the factors that can decrease the plan value and reliability (Dou et al. 2019).

Ineffective Logistic: A construction project should involve an effective system for better improvement and development of project. Effective logistic plan and resources help to improvement in project reliability for better performance and fast improvement.

Establishment of hierarchy structure

Before starting the project, it ensures that the hierarchy of the project plan should be followed properly for better performance of project. Hierarchy structure developed for steps and management of project accordingly planning. The structure of planning should not be followed properly and according to requirements. This factor can decrease the reliability and sustainability of project. Some of other findings in the project are shown below (Dou et al. 2019).

  • Poor manufacturing

  • Quality problems

  • Poor performance

  • Critical management plans

  • Limited market value and demand

  • Lacking social climate and changes

Positive factors

Offsite construction and effects of project management have some of the positive factors that are helps to the development of project. These factors have more reliability of project that is good aspect of employment and labour system. The positive effect of training and planning of construction projects in industries has high performance. The OSC plan adoption improves quality of the project and demonstrates the knowledge of project. Some of the positive factors that help in offset construction are shown below (Murtagh et al. 2020).

  • Good Strategy Planning

  • Most of the employees and labourers available for project

  • Financial condition is good

  • Machinery is available for project

  • Fast transportation

  • Good dealership



Recommendations

Offset construction and effect of management plan of project should manage the process and system functions for better performance of project. Construction project plan makes sure all types of possibilities can harm the project and planning. Project management is must important for project and implementation of management in system. Due to several differences between project and plan then ensure to project aspects and policies of project. Highly recommended is to in construction project, safety is most important for all the labour and employees of the organization that attend the project.

Quality management: It must be ensuring that that quality management and development of the system for better performance. Quality is more important for construction plans and development of the system projects. Material and uses products in construction should be more reliable and better in quality for the long sustainability of project. Industries used the higher quality material for the high strength of projects and building of industry. It increases the life of projects and buildings.

Use robotics in construction: The robotics on the construction plan can increase the working speed and timely. Robotics works with more sustainability and as compared to labour works (Gusmao Brissi et al. 2020). Fats working and risk of life is decrees by using the robotic system in offset construction project plan.

Control Flexibility of workers: If an industry uses more labour in project but ensures the flexibility of labour that can damage the hierarchy of project. Workers of projects and employees that are involved in offset construction plans should follow proper working and daily working.


Conclusion

Offset construction and effects of management, all the functions, and policies used in the project for better performance and good quality. Modular performance of construction and significant simulation for project is good factor of planning. It provides more knowledge about offset construction and the effects of construction systems in industries (Ginigaddara et al. 2019). The proj3ect plan and management system of site depends on labour and employees of project. Lean simulation of project and recommendation include the project planning and quality management system of the project. OSC reduces the presence of defects and errors in planning that can decrease the process and profit of project. The improvement in project planning and recommendation of a straight system should be followed properly for improvement in project. The estimated cost of project can increase by using robotics system in project but it makes fast construction and management of project. The potential of management systems and resources that are used in construction should be more. Utilization of resources and machinery in construction for improvement in performance and development of system for good profited and implementation. Total quality management (TQM) improves the aspects of project and sustainability of system for fats and good quality management.

Planning: Make a hierarchy structure for better understanding of project and its aspects. Planning is the major source of project management. All types of function should be involved in the project that helps to development of the project.

Raw material: Offsite construction need good quality raw materials that can increase the life of project. Raw materials that are used in off-site construction should be reliable and good in quality, ensure it for management of project. The limitations of project material for vendor side complete first for fats management of raw materials.

Empowerment: the labour and employees of the project maintain the function and system for better performance and use of equipment. labour of project should follow the policies of the project and maintain the needs of plan (Zhang et al. 2019).

Sustainability: Reliability and sustainability of the project are not good that is the reason for slow construction and law quality process that can decrease the operation of project. The sustainability of projects and management for implementing new and advanced technology in projects is slow as compared to other projects.

Limited resources: Offset construction and management of planning for good performance and development of the system with fewer resources, it’s not good for project. This project uses fewer resources for development of projects that can decrease the value of project (Zhang et al. 2019).




References

Agapiou, A. (2021) An exploration of the best value perceptions of small housebuilding developers towards offsite construction. Sustainability, 13(7), 4054. doi.org/10.3390/su13074054

Allied Market Research, 2020. Offsite Construction Market Type, Share, Size, Industry Growth. [online] Available at: https://www.alliedmarketresearch.com/offsite-construction-market-A12504 [Accessed 19 Mar. 2022]

Altaf, M.S., Bouferguene, A., Liu, H., Al-Hussein, M. and Yu, H. (2018). Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID. Automation in Construction, [online] 85, pp.369–383. Available at: https://www.sciencedirect.com/science/article/abs/pii/S0926580517301486 [Accessed 19 Mar. 2022].

?Arashpour, M., Wakefield, R., Abbasi, B., Lee, E.W.M. and Minas, J. (2018). Off-site construction optimization: Sequencing multiple job classes with time constraints. Automation in Construction, [online] 71, pp.262–270. Available at: https://www.sciencedirect.com/science/article/abs/pii/S092658051630156X [Accessed 19 Mar. 2022].

Architectural Engineering and Design Management. (2018). Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review. [online] Available at: https://www.tandfonline.com/doi/abs/10.1080/17452007.2017.1291410 [Accessed 19 Mar. 2022].

?Assaad, R., El-adaway, I.H., Hastak, M. and Needy, K.L. (2020). Commercial and Legal Considerations of Offsite Construction Projects and their Hybrid Transactions. Journal of Construction Engineering and Management, [online] 146(12), p.05020019. Available at: https://ascelibrary.org/doi/full/10.1061/%28ASCE%29CO.1943-7862.0001948 [Accessed 19 Mar. 2022].

Brusselaers, N., Mommens, K.M., Fufa, S.M., Venås, C. and Macharis, C., 2020. MIMIC Deliverable 2.1: Methodologies for impact assessment of on-site and off-site construction logistics. Link: - https://www.mimic-project.eu/sites/default/files/content/resource/files/1.0_d2.1_impact_methodologies.pdf

Construction Management and Economics. (2020). A novel mathematical optimisation model for the scheduling of activities in modular construction factories. [online] Available at: https://www.tandfonline.com/doi/abs/10.1080/01446193.2019.1682174 [Accessed 19 Mar. 2022].

Darlow, G., Rotimi, J.O. and Shahzad, W.M., 2021. Automation in New Zealand's offsite construction (OSC): a status update. Built Environment Project and Asset Management. DOI 10.1108/BEPAM-11-2020-0174

?Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system | Emerald Insight. (2019). Construction Innovation. [online] Available at: https://www.emerald.com/insight/content/doi/10.1108/CI-07-2019-0064/full/html [Accessed 19 Mar. 2022].

Dou, Y., Xue, X., Zhao, Z. and Luo, X. (2019) Factors influence China’s off-site construction technology innovation diffusion. Sustainability, 11(7), 18-49. doi:10.3390/su11071849

?Environmental sustainability of off-site manufacturing: a literature review | Emerald Insight. (2019). Engineering, Construction and Architectural Management. [online] Available at: https://www.emerald.com/insight/content/doi/10.1108/ECAM-06-2019-0288/full/html [Accessed 19 Mar. 2022].

Ginigaddara, B., Perera, S., Feng, Y. and Rahnamayiezekavat, P. (2019) Typologies of offsite construction. 1-11. . DOI: doi.org/10.31705/WCS.2019.56

Goh, M. and Goh, Y.M. (2019) Lean production theory-based simulation of modular construction processes. Automation in Construction, 101, 227-244. doi.org/10.1016/j.autcon.2018.12.017

Goodman, J.R. and Colombo, L.J., 2021. Geometric Control of two Quadrotors Carrying a Rigid Rod with Elastic Cables. arXiv preprint arXiv:2104.06155. Link: - https://arxiv.org/pdf/2104.06155

Guribie, F.L., Kheni, N.A. and Sule, M., 2022. Structural equation modeling of the critical driving forces of offsite construction in Ghana. Built Environment Project and Asset Management. DOI: 10.1108/BEPAM-03-2021-0051

Gusmao Brissi, S., Debs, L. and Elwakil, E. (2020) A Review on the Factors Affecting the Use of Offsite Construction in Multifamily Housing in the United States. Buildings, 11(1), 5. doi.org/10.3390/buildings11010005

Hosseini, M.R., Martek, I., Zavadskas, E.K., Aibinu, A.A., Arashpour, M. and Chileshe, N. (2018). Critical evaluation of off-site construction research: A Scientometric analysis. Automation in Construction, [online] 87, pp.235–247. Available at: https://www.sciencedirect.com/science/article/abs/pii/S092658051730609X [Accessed 19 Mar. 2022].

?Jang, J., Ahn, S., Cha, S.H., Cho, K., Koo, C. and Kim, T.W. (2020). Toward productivity in future construction: mapping knowledge and finding insights for achieving successful offsite construction projects. Journal of Computational Design and Engineering, [online] 8(1), pp.1–14. Available at: https://academic.oup.com/jcde/article/8/1/1/5959726?login=true#237649435 [Accessed 18 Mar. 2022].

Jin, R., Gao, S., Cheshmehzangi, A. and Aboagye-Nimo, E. (2018). A holistic review of off-site construction literature published between 2008 and 2018. Journal of Cleaner Production, [online] 202, pp.1202–1219. Available at: https://www.sciencedirect.com/science/article/abs/pii/S0959652618325381 [Accessed 19 Mar. 2022].

Kamali, M. and Hewage, K. (2017). Development of performance criteria for sustainability evaluation of modular versus conventional construction methods. Journal of Cleaner Production, [online] 142, pp.3592–3606. Available at: https://www.sciencedirect.com/science/article/abs/pii/S0959652616317280 [Accessed 19 Mar. 2022].

Kumar, A.S. and Shajan, S.S., 2022. Demolished building waste management: a review. Sustainability, Agri, Food and Environmental Research10(1). https://doi.org/10.7770/safer-V10N1-art2569

Liu, G., Nzige, J.H. and Li, K., 2019. Trending topics and themes in offsite construction (OSC) research: The application of topic modelling. Construction innovation. . https://doi.org/10.3390/buildings12010020

Matthias, B. (2018) Is Offsite Construction The Solution To A Broken Process?, Matthias, B. [online] Available at: https://www.bfp.vc/is-offsite-construction-the-solution-to-a-broken-process/ Accessed on: 19 March 2022.

Murtagh, N., Scott, L. and Fan, J. (2020) Sustainable and resilient construction: Current status and future challenges. Journal of Cleaner Production, 268, 122-264. DOI.org/10.1016/j.jclepro.2020.122264

Nguyen, B.N., London, K.A. and Zhang, P., 2020, June. Analysis and visualisation of stakeholder relationship in Offsite construction: Social Network Analysis approach. In IOP Conference Series: Materials Science and Engineering (Vol. 869, No. 6, p. 062029). IOP Publishing. doi:10.1088/1757-899X/869/6/062029

Ortega Silva, M. (2020) Modernizing the Dutch Housing Industry using offsite construction: Removing adoption barriers through innovation policy. 1-13. Link: https://repository.tudelft.nl/islandora/object/uuid:b6b468ee-c397-4ba0-a794-e55092de93a1/datastream/OBJ1/download.

?Proquest.com. (2018). Economic analysis and Operational Research tools for estimating productivity levels in off-site construction - ProQuest. [online] Available at: https://www.proquest.com/openview/24dbc5413d5d36d613c8166bd047b07f/1?pq-origsite=gscholar&cbl=5051204 [Accessed 19 Mar. 2022].

Razkenari, M., Fenner, A., Shojaei, A., Hakim, H. and Kibert, C. (2020). Perceptions of offsite construction in the United States: An investigation of current practices. Journal of Building Engineering, [online] 29, p.101138. Available at: https://www.sciencedirect.com/science/article/abs/pii/S2352710219306060 [Accessed 18 Mar. 2022].?

Resende, E.B., Faria, L.C.S. and Aversi-Ferreira, T.A., 2021. Quantitative and qualitative study of waste produced by civil construction of masonry in the South of Minas Gerais and comments on sustainability. Research, Society and Development10(14), pp.e15101421381-e15101421381. DOI: http://dx.doi.org/10.33448/rsd-v10i14.21381

Sampletemplates, (2021) FREE 10+ Quantitative Risk Analysis Samples In PDF | MS Word | Excel. Sampletemplates [online] Available at: https://www.sampletemplates.com/business-templates/analysis/sample-quantitative-risk-analysis.html Accessed on: 19 March 2022.

Smith R. E. (2018). Off-Site and Modular Construction Explained | WBDG - Whole Building Design Guide. [online] Available at: https://www.wbdg.org/resources/site-and-modular-construction-explained [Accessed 19 Mar. 2022].

Sutrisna, M. and Goulding, J., 2019. Managing information flow and design processes to reduce design risks in offsite construction projects. Engineering, construction and architectural management. Link: - https://wlv.openrepository.com/bitstream/handle/2436/622949/PDF_Proof%20Sutrisna%20and%20Goulding%20%28June%202018%29.pdf?sequence=3&isAllowed=y

Sutrisna, M., Ramanayaka, C.D. and Goulding, J.S. (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural engineering and design management, 14(5), 381-397.

?Vuuren and Middleton, C. (2020). Methodology for quantifying the benefits of offsite construction. Cam.ac.uk. [online] Available at: https://www.repository.cam.ac.uk/handle/1810/317071 [Accessed 19 Mar. 2022].

Wang, M., Wang, C.C., Sepasgozar, S. and Zlatanova, S. (2020) A systematic review of digital technology adoption in off-site construction: Current status and future direction towards industry 4.0. Buildings, 10(11), 204. doi:10.3390/buildings10110204

Wang, M., Wang, C.C., Sepasgozar, S. and Zlatanova, S., 2020. A systematic review of digital technology adoption in off-site construction: Current status and future direction towards industry 4.0. Buildings10(11), p.204. doi:10.3390/buildings10110204

Zhang, R., Zhou, A.S., Tahmasebi, S. and Whyte, J. (2019) August. Long-standing themes and new developments in offsite construction: The case of UK housing. In Proceedings of the Institution of Civil Engineers-Civil Engineering. 172(6), 29-35. doi: 10.1680/jcien.19.00011

Zhou, J., He, P., Qin, Y. and Ren, D. (2019). A selection model based on SWOT analysis for determining a suitable strategy of prefabrication implementation in rural areas. Sustainable Cities and Society, [online] 50, p.101715. Available at: https://www.sciencedirect.com/science/article/abs/pii/S2210670719301131 [Accessed 19 Mar. 2022].


19


FAQ's